Fincantieri starts working on first next-generation OPV for Italian Navy

Fincantieri press release

The ceremony was attended, among others, by the General Manager of Fincantieri’s Naval Vessels DivisionDario Deste, the Director of the Naval Armaments Directorate – NAVARMAdmiral Chief Inspector Giuseppe Abbamonte, and the CEO of Orizzonte Sistemi NavaliGiovanni Sorrentino.

This program, put in place to contribute to the modernization and renewal of the Italian Navy’s units, envisages the construction of four vessels, with an option for additional two, with the first delivery scheduled for 2027. The overall value of the first four ships, contracted by Orizzonte Sistemi Navali (OSN), a joint venture owned by Fincantieri (51%) and Leonardo (49%), is approximately 1.2 billion euros, including the related logistical support.

The OPV program responds to the need to ensure adequate capabilities for presence and surveillance, maritime patrolling, merchant traffic control, protection of lines of communication and the exclusive economic zone, as well as operations to protect against threats derived from marine pollution, such as toxic liquid spills.

Fincantieri starts working on first next-generation OPV for Italian Navy
Fincantieri photo from the steel cutting ceremony

With a length of about 95 meters long, a displacement of 2,400 tons and the capacity to accommodate 97 crew members on board, these new patrol vessels will be marked by a package of technological solutions, as well as standards of excellence in automation and maneuverability, that will make them suitable for operating in a wide range of tactical scenarios and weather conditions.

Among the most innovative features is the integrated naval cockpit, developed for the Italian Navy’s Multipurpose Offshore Patrol Vessels (PPAs), co-produced by Fincantieri NexTech and Leonardo. This represents a generational leap, allowing the control of engines, rudders, and platform systems, as well as some combat system functions, by just two operators – pilot and co-pilot – thus optimizing efficiency and safety.

The OPV program marks a major achievement for Fincantieri, further strengthening its position as a global leader in naval defense with its FCX product range, which includes these new patrol vessels. This project not only reinforces the company’s strategic role as a partner of the Italian Navy, but also deepens its collaboration with Leonardo through Orizzonte Sistemi Navali, showcasing Italy’s expertise in defense and in advanced naval integration.

– End –

The post Fincantieri starts working on first next-generation OPV for Italian Navy appeared first on Naval News.

发布者:Naval News Staff,转转请注明出处:https://robotalks.cn/fincantieri-starts-working-on-first-next-generation-opv-for-italian-navy/

(0)
上一篇 29 9 月, 2024 11:09 下午
下一篇 29 9 月, 2024 11:20 下午

相关推荐

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信
社群的价值在于通过分享与互动,让想法产生更多想法,创新激发更多创新。