PCL and Stantec Picked for Expansion of San Diego Plant to Deal With Tijuana Wastewater Flows

PCL Building protects a $42-million modern design-build agreement to broaden San Diego’s South Bay International Wastewater Therapy plant, the very first agreement in a general $600 million job to deal with wastewater circulations that have actually been going across the boundary with Mexico considering that 2022. …
Read More

发布者:Rubina Veerakone McGovern Institute for Brain Research,转转请注明出处:https://robotalks.cn/pcl-and-stantec-picked-for-expansion-of-san-diego-plant-to-deal-with-tijuana-wastewater-flows/

(0)
上一篇 23 8 月, 2024 4:18 上午
下一篇 23 8 月, 2024 4:18 上午

相关推荐

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信
社群的价值在于通过分享与互动,让想法产生更多想法,创新激发更多创新。