Hanoi Metro Line 3 to start passenger service with Alstom’s first integrated system in Vietnam

– – • Upon conclusion, the complete line will certainly reach 12.5 kilometres with an overall of 12 terminals, boosting accessibility for 1.6 million homeowners of Hanoi city – • The Metropolitan area system is made to improve traveler experience and convenience, with a peak ability of 23,900 guests per hour per instructions – • Outfitted with the sophisticated Urbalis 400 Communications Based Train Control (CBTC) service, the Hanoi Line 3 will dramatically boost connection, decrease traveling time, and make certain relia …

Review the complete tale at https://www.webwire.com/ViewPressRel.asp?aId=325384

.

发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/hanoi-metro-line-3-to-start-passenger-service-with-alstoms-first-integrated-system-in-vietnam/

(0)
上一篇 10 8 月, 2024 9:19 上午
下一篇 10 8 月, 2024 10:18 上午

相关推荐

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信
社群的价值在于通过分享与互动,让想法产生更多想法,创新激发更多创新。