Inside a small manufacturing cell at Collins Aerospace’s wheel-and-brake center in Troy, Ohio, 2 innovative equipments currently change the 5 heritage equipments as soon as required to create airplane wheels. With each other, they can reduce manufacturing time from 45 days to simply 7– a press the group calls “Tires in a Week.” Greg Smith, supervisor of procedures, […].
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/how-a-ww2-era-factory-is-cutting-production-time-by-80-percent/