In this picture from Dec. 11, 2024, the 212-foot-tall SLS (Area Introduce System) core phase is reduced right into High Bay 2 at the Car Setting Up Structure at NASA’s Kennedy Area Facility in Florida. With the transfer to High Bay 2, NASA and Boeing specialists currently have 360-degree accessibility to the core phase both inside and on the surface.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/image-artemis-ii-core-stage-moves-to-high-bay-2/