Aim-listed Ironveld has reported that Daemaneng Minerals has made significant strides in preparing Ironveld’s joint venture dense media separation- (DMS-) grade magnetite processing facility, in Limpopo, for the upcoming operational ramp-up. The company says key commissioning and readiness activities have been completed, including confirming the plant’s power draw and procuring a new containerised Caterpillar generator, with the existing unit now designated as a backup.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/ironveld-reports-progress-in-dms-grade-magnetite-processing-facility/