Purpose- and AltX-listed varied steels manufacturer Jubilee Metals Team fell short to satisfy its copper manufacturing target at its Roan procedure, in Zambia, owing to power restrictions, the business revealed in a functional and job upgrade on January 13 for the 6 months finished December 31– the very first fifty percent of its 2025 fiscal year. Copper manufacturing in Zambia completed 1 454 t, a decrease from the 1 683 t generated in the very first fifty percent of the 2024 fiscal year, and disappointing the changed target of 1 800 t.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/jubilee-fails-to-meet-copper-production-targets-in-zambia-owing-to-power-cuts/