Jubilee fails to meet copper production targets in Zambia owing to power cuts

Purpose- and AltX-listed varied steels manufacturer Jubilee Metals Team fell short to satisfy its copper manufacturing target at its Roan procedure, in Zambia, owing to power restrictions, the business revealed in a functional and job upgrade on January 13 for the 6 months finished December 31– the very first fifty percent of its 2025 fiscal year. Copper manufacturing in Zambia completed 1 454 t, a decrease from the 1 683 t generated in the very first fifty percent of the 2024 fiscal year, and disappointing the changed target of 1 800 t.

发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/jubilee-fails-to-meet-copper-production-targets-in-zambia-owing-to-power-cuts/

(0)
上一篇 13 1 月, 2025
下一篇 13 1 月, 2025

相关推荐

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信
社群的价值在于通过分享与互动,让想法产生更多想法,创新激发更多创新。