LSE- and ISE-listed titanium minerals and zircon manufacturer Kenmare Resources has actually minimized its 2025 manufacturing support after appointing hold-ups at its updated Damp Concentrator Plant (WCP) A led to lower-than-expected result. The business currently anticipates to generate in between 870 000 t and 905 000 t of ilmenite in 2025, together with 8 500 t to 9 500 t of rutile. Previous 2025 support had actually predicted greater ilmenite and rutile result prior to the influence of appointing hold-ups.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/kenmare-cuts-2025-output-guidance-as-wcp-a-commissioning-delays-affect-production/