Building and construction on the refinery is arranged to start in 2027, with manufacturing targeted for the 3rd quarter of 2028.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/louisiana-to-get-850m-to-build-rare-earth-refinery/
Building and construction on the refinery is arranged to start in 2027, with manufacturing targeted for the 3rd quarter of 2028.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/louisiana-to-get-850m-to-build-rare-earth-refinery/