A 500 MVA transformer at the Midas substation, in Gauteng, stumbled at night of December 11, interfering with electrical energy supply to around 15 mines in the Carletonville, Fochville and Potchefstroom locations, along with to household clients. State-owned energy Eskom claims in a December 12 upgrade that its technological groups acted promptly and have actually handled to bring back crucial lots to the mines, making it possible for restricted procedures.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/midas-substation-repairs-still-under-way-but-essential-load-to-mines-restored/