TOKYO–(BUSINESS WIRE)–Mitsubishi Electrical Company (TOKYO: 6503) introduced at this time that it’ll make investments roughly 10 billion yen to assemble a brand new facility for the meeting and inspection of energy semiconductor modules at its Energy System Works in Fukuoka Prefecture, Japan. The plant, which was initially introduced on March 14, 2023, is scheduled to start operations in October 2026. As the first facility for assembling and inspecting energy semiconductor modules, the plant will consolid
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/mitsubishi-electrics-power-device-works-to-construct-new-plant/