The brand-new dock, created in conformity with the Port’s seismic code, partly changed a lumber dock that was thoroughly harmed in a fire in 2014.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/port-of-los-angeles-completes-construction-of-berths-177-182/