In a volunteer manufacturing upgrade, Northam Platinum has actually reported growing half-year efficiency from the ramping-up platinum team steels (PGMs) and chrome Eland mine. Eland’s chrome concentrate manufacturing rose by 113.1% to 115 387 t in the 6 months throughout of in 2015, the very first fifty percent of Northam’s 2025 fiscal year (H1 FY2025) compared to the 54 146 t in H1 FY2024 and its PGM concentrate outcome was likewise a great 15.1% up at 37 488 oz compared to H1 FY2024’s 32 574 oz.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/rapidly-rising-half-year-output-from-northam-platinums-eland-mine-marred-by-tragedy/