Space Force new GPS satellites are running months behind schedule

The Pentagon’s first batch of recent and extra succesful GPS satellites is as a lot as eight to 11 months behind the specified supply schedule as a result of contractor Lockheed Martin Corp. is having problem manufacturing some advanced components, in keeping with the U.S. Area Power.

发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/space-force-new-gps-satellites-are-running-months-behind-schedule/

(0)
上一篇 12 11 月, 2024 11:18 上午
下一篇 12 11 月, 2024 11:18 上午

相关推荐

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信
社群的价值在于通过分享与互动,让想法产生更多想法,创新激发更多创新。