The $4.8 billion bridge task is set up to open up at some point in 2026, with significant building and construction having actually currently concluded, and screening currently underway.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/trump-threatens-to-block-opening-of-cross-border-canadian-bridge/