The line will certainly get in touch with a EUR2.7 billion ($ 2.9 billion) track that will certainly connect Uganda’s resources of Kampala to Malaba at the boundary with Kenya.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/uganda-plans-600m-rail-line-to-connect-proposed-port/