London- and Johannesburg-listed Valterra Platinum has successfully reached steady-state production at the Tumela Lower section of the Amandelbult mine, in Limpopo, marking the completion of the mine’s recovery to full production after flooding occurred in February.
The Tumela Lower ramp-up resulted in a 118% quarter-on-quarter increase in Amandelbult’s production to 153 100 oz; however, production lagged 3% on a year-on-year basis owing to lower tonnes milled and a lower head grade.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/valterras-third-quarter-volumes-dip-but-it-expects-these-will-recover-soon/