In the future, billing terminals along highways, in car park or at logistics facilities will certainly need to supply a lot more power in a brief area of time than they do today. Consequently, brand-new billing terminals can no more just be linked to the reduced voltage power grid.
发布者:Dr.Durant,转转请注明出处:https://robotalks.cn/charging-infrastructure-of-medium-voltage-station-upgraded-to-megawatt-class/